Memorial Construction in Pictures

The construction was of Tucson Buffalo Soldier Memorial Plaza was a amazing acommplishment.  The groung breaking for the project took place on October 29, 2020 and the memorial was dedicated on May 3, 2021.  Just under six months!  The following photo progression is provided for your review:

The plaza area  in 2019 before it was selected to be the memorial site.
image-917100-DSC06064-c9f0f.w640.JPG
image-917102-DSC06069-c51ce.w640.JPG
Construction to escavate the exisit plaza area started in October 2020.
image-899560-Buffalo_Soldiers_Memorial_Oct2020_(8)-6512b.w640.JPG
The construction and reshaping of the existing plaza area
image-917104-IMG_1760_(1)-aab32.w640.JPG
image-917105-IMG_1766_(2)-d3d94.w640.JPG
The foundation concrete.  This is the area of the plaza that the Buffalo Soldier historical granite monument will be placed.
image-915090-IMG_1834-aab32.w640.JPG
The Sirrea brick paver installation was completed in March.
image-915093-IMG_1824-c9f0f.w640.JPG
The seat wall was an excellent idea for the plaza area
image-917106-IMG_1783-16790.w640.JPG
image-916996-IMG_1857-aab32.w640.JPG
The Buffalo Soldier historical plaque holders are installed.  They will display the Buffal Soldier
history panels. ​​​​​​​
image-917122-IMG_1859-8f14e.w640.JPG
image-917123-IMG_1860-c20ad.w640.JPG
image-916995-IMG_1629-c20ad.w640.JPG
image-916997-IMG_1861-aab32.w640.JPG